How a OTI helped a high traffic mall achieve peak demand reduction at the height of Texas summer.

Buildings: One mall complex

Location: Woodlands, Texas

Size: 1.4 million sq. ft.

Start date: January, 2017

Status: Project complete, partnership ongoing

The Woodlands Mall, a Brookfield Properties Center

The Woodlands Mall is a bi-level, enclosed shopping center located 30 miles north of Houston. The mall was renovated in 2004 and since then, GGP, now Brookfield Properties, has included Woodlands in the energy management upgrade plans that span their entire portfolio. OTI is master systems integrator of record for Brookfield working to design and implement energy and demand management programs, controls retrofits and analytics.

 

woodlands

 

The Woodlands Mall was selected for a peak demand management pilot project in early 2017. By reducing energy usage in common areas during the utility company’s pre-determined peak hours, Woodlands could experience significant overall energy cost reductions. OTI managed the development and integration of a third party, automatic demand control program for the HVAC system based on electrical consumption created custom for the property by Kodaro. The demand management program uses SkySpark for system monitoring and notification, Niagara for building automation control and BACnet and Modbus for communication protocols across controllers.

woodlands

Challenges

  • The peak demand reduction strategy was dependent on the accuracy of existing electricity meters on the property. Because analytics had not been previously utilized on Woodlands’ HVAC system, the actual status of electricity meters was not known at the outset of the project and therefore actual peak reductions could have been far less than projected. A lackluster return on energy savings would have limited the expansion of the demand reduction project beyond the pilot.
  • Initial analysis of utility billing data was required to understand the demand charges for common areas before the demand management strategy could be finalized.
  • Project development spanned seasons and was delivered at the peak of summer heat when equipment would be operating in high gear and guest comfort is a top priority.

 

Successes

  • Peak reduction of approximately 100kW achieved just three days after implementation, at the end of July when outside air temperatures were in the high 90s.
  • Since initial implementation, the project continues to return monthly energy reduction of 5,000kWh.
  • Additional development of peak demand prediction and pre-cooling algorithms has provided 30% additional cost savings on this project than at first delivery of the project in July.
  • Based on this pilot project, GGP has expanded peak demand management to additional properties in its portfolio.